Photos of the Brookshire Project

View of the tower section coupler.
View of the coupler used to connect the tower sections.
Connecting the guy wires to the mast.
Connecting the guy wires to the mast/tower.
Raising the tower to chect the guy wires and jin pole.
Raising the tower to chect the guy wires and jin pole..
This view shows one of our technicians working on one of the subassemblies for the generator prior to attaching the generator to the mast.
This view shows one of our technicians working on one of the subassemblies for the generator prior to attaching the generator to the mast.
The Head Assembly sans the blades.
This photo shows the head assembly prior to attaching the turbine blades.
The head assembly with the turbine blades installed.
The generator assembly complete with the turbine blades installed and ready for raising into place.
The tower is halfway into position.
This is a view of the process used to raise the tower into place.
Almost up!
If you look closely in the lower left hand corner of the photo you can see the winch unit we use to erect the tower.
Almost completely raised.
Here the crew is attaching the final guy wires and preparing to lock down the tower.
Almost completely raised.
This tower is now free standing and ready to b put into use.

Think Wind, Water, and Sun

The information and images contained within this document is sole property and copyrighted by Capital Communications. Any unauthorized use of this material if forbidden.
This website was developed by Taylor Enterprises.