Photos of the Brookshire Project
|
View of the coupler used to connect the tower sections.
|
 Connecting the guy wires to the mast/tower.
|

Raising the tower to chect the guy wires and jin pole..
|

This view shows one of our technicians working on one of the subassemblies for the generator prior to attaching the generator to the mast.
|

This photo shows the head assembly prior to attaching the turbine blades.
|

The generator assembly complete with the turbine blades installed and ready for raising into place.
|

This is a view of the process used to raise the tower into place.
|

If you look closely in the lower left hand corner of the photo you can see the winch unit we use to erect the tower.
|

Here the crew is attaching the final guy wires and preparing to lock down the tower.
|

This tower is now free standing and ready to b put into use.
|